Freight: Enercon E70 wind turbine
Pickup: Netherlands
Destination: Netherlands
Bremer Lloyd dismantled one Enercon E70 in the Netherlands. Because of the wet and instable ground, a special ground preparation was needed. Bremer Lloyd dismantled the full turbine within one and a half day and managed the direct loading onto trucks.