Freight: Rotor Blade Moulds

Pick-up: Italy

Delivery: India

Bremer Lloyd has been awarded with the transport of over 20 mtr long rotor blade moulds to India. He scope consisted in the pre-carriage, customs clearance, handling, sea transport and handling to final destination.

Freight: Steel mill parts to Japan

Pick up: Vietnam

Delivery: Japan

Again, Bremer Lloyd has been awarded to transport another lot of steel mill component from Vietnam to Japan. The sea transport endured less than 15 days to the Japanese destination port, where the cargo has been discharged directly, which allowed the on transportation to the steel mill construction side.

Freight: Wind turbines

Pick up: China

Delivery: Spain

And the third wind turbine lot for January. Bremer Lloyd has been awarded with the transport of up to 60 metres long rotor blades and up to 60 tons heavy head components from China to Spain. The sea transport endured less than 30 days to the Spanish destination port, where Bremer Lloyd is responsible for the handling and further on-carriage directly to the wind park.

Freight: 13 Rotorhouses

Pick up: China

Delivery: Cuxhaven, Germany

Bremer Lloyd transports 13 up to 45 tons heavy rotor house ex China to Germany. The scope consisted in arrange the pre-carriage, the sea transport, handling at POD and distribution to multiple receivers in Germany.

Freight: 9 Rotor Blades

Pick up: China

Delivery: Brake

Bremer Lloyd started the new year amongst others with three loadings in China bound for Europe. The first transport consisted in picking up 9x 67 metres long rotor blades ex works, the handling in loading port, sea transport to Germany and handling in port of discharge.

Freight: 3 Rotorblades + 3 Cases with windmill equipment

Pick up: China

Delivery: Aliaga

Bremer Lloyd performs the next transport of wind turbine generator components. The scope consisted in the pre-carriage of the rotor blades and over 40 tons heavy head components from the factory, the sea transport and port handling at port of destination. Again Bremer Lloyd ensured a timely arrival one week ahead of planned delivery date.

Freight: 9 Rotorblades

Pick up: China

Delivery: Cuxhaven, Germany

Bremer Lloyd has been awarded with the transport of 9x 60 mtr long Rotor Blades ex China to Germany. The scope consisted in the pre-carriage, sea transport and on-carriage in Germany. The client required a fast transit, which has been ensured by Bremer Lloyd, by chartering a vessel with a transit time of less than 40 days. The punctual delivery has again been achieved.

 

Freight: 96 Rotorblades

Pick up: Portugal

Delivery: Eemshaven, Netherlands

Bremer Lloyd has been awarded with the supply of the 96 Rotor Blades for the 200MW Trianel Windpark Borkum II offshore wind park in the North Sea. Bremer Lloyd is in charge for the engineering and sea transport, to ensure the most optimized intake for the rotor blades, measuring more than 76 metres in length including transport frames. After one year of intense pre-planning and the selection of the most suitable sea vessel, the rotor blades for all 32 wind turbine generators will be delivered until Summer 2019.

Freight: 3 Rudder blades + Equipment

Pickup: North China

Delivery: South China

Bremer Lloyd successfully arranged the transport of in total 3 rudder blades + equipment from their building site in North China to South China.
Due to the challenging dimensions of a 650 cm wide cargo and arrival restrictions, the transport to the nearest port and the transport via coaster was the safest and fastest solution.